Diversion Structure Maintenance February 9~11
Eroded west bank was
recovered. Gravels and stabilizers were spread
out on the bank. Figures 1 and 2 show
the downstream and the upstream, respectively.
![]()
![]()

To flush sediment deposited
on the fish bypass of the intake structure, the fish bypass gate opened (figure
3). The fish passage water flowed back
into the intake structure. Sediment
deposited on the fish bypass (figures 4 and 5) was flushed into the intake
structure (figure 6).
to south intake to north intake
![]()
![]()
![]()
![]()

Figure 3 Figure
4
Connected with the
intake gate (figure 3) Connected with the fish
passage
![]()
![]()

Figure 5 Figure
6