Middle Channel Sand Bar Relocation February 12~15

Current Opened Gate: #1, #2, #3 (half down) and #16.

 

Gates #1, #2, #3 (half down) and #16 remained open.  Water depth was maintained 3.02 ft on the PLC screen.

Water level was measured 4995.25 ft upstream and 4994.3 ft downstream at 8 am 15-Feb.

Sand bar downstream of gate #10 were existed (figure 2).

 

                                    Figure 1                                                                                              Figure 2

 

                                    Figure 3 [FP4]