Middle Channel Sand Bar Relocation February 12~15
Current Opened Gate: #1, #2, #3 (half down) and #16.
Gates #1, #2, #3 (half down)
and #16 remained open. Water depth was
maintained 3.02 ft on the PLC screen.
Water level was measured 4995.25
ft upstream and 4994.3 ft downstream at 8 am 15-Feb.
Sand bar downstream of gate
#10 were existed (figure 2).
![]()

Figure
1 Figure
2

Figure 3 [FP4]