Gate Trial Operation February 15
All gates were fully opened
on 15-Feb before the beginning for the gate trial operation task 3. Gate configuration was changed from close to
fully open and water depth was dropped 2.32 ft in this trial operation.
Initially, gates were fully
raised except #1 (figure 1). Water depth
was increased up to 3.96 ft on the PLC screen.
Downstream sand bars were showed up (figure 2) and discharge through the
fish passage flow rate was increased (figure 3).
![]()

Figure 1 Figure
2 Figure
3
Gates located middle of the
channel (gates #12, 13, and 14) were opened at first (figure 4). Water depth was decreased 3.67 ft, and sand
bars downstream of the middle of the channel were disappeared (figure 5). Discharge through the fish passage was not
much changed yet (figure 6).
Gate #12~14
![]()

Figure 4 Figure
5 Figure
6
Gates #1~3, #5, and #7~14
were lowered (figure 7), and water depth was observed 2.17 ft. Upstream sand bars were showed up (figure
8). Fish passage discharge was decreased
(water depth was lowered as shown in figure 9).
![]()

Figure 7 Figure
8 Figure
9
All gates were fully lowered
finally (figure 10), and the lowest water depth was observed 1.64 ft on the PLC
screen. More upstream sand bars were
showed up (figure 11). Riprap rocks in
the fish passage were exposed since lower water depth (figure 12).
![]()
![]()

Figure 10 Figure
11 Figure
12