Middle Channel Sand Bar Relocation February 19
Current Opened Gate: All gates fully opened.
All gates have been fully
opened (lowered) since 15-Feb as shown in figure 1. Water level was slightly deceased than last
Friday (16-Feb) 4994.25 ft upstream and 4994.5 ft downstream. Flow rate was approximately 770 cfs according to the USGS gage (figure 2, 08329928, at Paseo Del Norte).

Figure 1 Figure
2