Middle Channel Sand Bar Relocation February 28
Current Opened Gate: #1, 2, and 17.
Gates #1, #2, and #17
lowered. Water level was slightly decreased
4995.05 ft upstream and 4993.75 ft downstream.
South intake gate was opened, but the river flow could not enter into the
intake channel because of lower water level.

Figure 1 shows panoramic view
of the diversion dam downstream. Sand
bars are not found right downstream of the diversion dam, but some of them are found
at the far of the diversion dam (green circles). It seems that sand bars have been washed away
and relocated downstream from the diversion dam.
![]()
![]()
![]()