Central Gate Opening for Removing Sand Bar on Middle
Channel March 30
Current Opened Gate: #12~22.
Gates #12 ~22 were opened to
remove sand bar placed on middle channel.
Gates were set 3.5 ft water depth and 3.2 ft was measured on PLC
screen.
River discharge has changed from
2200 cfs to 1700 cfs for 26-Mar ~ 1-Apr (figure 1).
Although, sand bar on middle
channel was still existed, south part of the sand bar on middle channel has been
removed (in green circle, figure 2).
Small sand bar was found on
flow diverting region front of the fish passage (figure 3)

Figure
1
![]()
![]()

Figure 2 Figure
3