Diversion Gate Trial Operation April 12
Current Opened Gates: Automatically #8 ~ 18
Central gates #8 ~18 were
opened automatically (Figure 1). Gates were
set 3.5 ft water depth and 2.8 ft was measured on PLC screen.
Erosion at the fish passage
entry is still in progress (red circle in Figure 2). It may be caused by the recently formed sand bar (green circle in
Figure 2).
River current hits the sand
bar and reflects flow direction to the fish passage bank.
Sediment has been deposited and
grown at the north deck as shown in Figure 3.
![]()
![]()

Figure 1
Figure 2 Figure
3