Diversion Gate Trial Operation April 18
Current Opened Gates: All gates fully opened
All gates were fully opened,
and 2.2 ft water depth was measured on PLC screen. Water level was decreased at the Alameda bridge USGS gage station
(Figure 1) and
approximately 1,200 cfs flow
rate was measured at the Paseo Del Norte station.
Remote boat has been arrived
at the diversion site (Figure 2).
Interesting drying shape of sediment deposition (cohesive
characteristic, maybe clay?) was found at the
south intake channel.
High sediment has been
deposited front the intake structure and through the whole fish passage as
shown in Figures 4-6.
![]()