Remote Boat Trial Operation April 19~20
Current Opened Gates: All gates fully opened
Remote boat was assembled
and tested in the intake bay. Dr. Coonrod was operating the boat with a remote
controller.
On the trial operations for
19-20 April, the boat was operating well, but technical problem of water depth
and GPS data transferring to computer was happened.
GPS data was not transferred,
and water depth transducer has to be calibrated.
Captain Julie !!! Power box Water depth and GPS data
logger GPS receiver Propeller motor Water depth transducer
![]()
![]()

![]()