Diversion Gate Trial
Operation May 7
Current Opened Gates: #11 ~#21
Gates
#11~#21 were opened for the task 6.
Water depth was 3.55 ft on PLC screen.
River discharge was about 2750 cfs near Paseo Del Norte Bridge.
Any
sand bar was not shown upstream and downstream.
Click for bigger aerial image taken
20-Apr-07