Middle Channel Sand Bar Relocation February 8~9
Current Opened Gate: #1, #2, #3 and #18.
Gates #1, #2, #3 and #18
have remained open since 8-Feb-07 to flush sand bars located in middle channel
(figures1 and 2).
The upstream water depth is
maintained 3 ft on the PLC screen. By
the way, water depth was maintained 4.31 ft for several hours on 8-Feb to flush
sediment along the fish passage (figure 3, taken on 9-Feb).
Water levels 4995.46 ft
upstream and 4993.5 ft downstream were measured on 9-Feb.
Gate #1, #2 & #3 Gate #18
![]()
![]()
![]()

Figure 1 [EB1] Figure
2 [EB2] Figure
3 [FP4]
Most sand bars on the middle
of the channel were washed away (figure 4).
Eroded west bank was
recovered this morning (9-Feb) (figures 4 and 5).
![]()
![]()
Figure 4 [EB3] Figure
5