UNM Header UNM Home Page Civil Engineering Home Page

Hydraulics Lab: Past Projects: 1990-2000

Year 11  [July, 1999 – June, 2000]

  • Black Diversion Outfall
  • Ring Chanmber and Type 6 Energy Dissipators
  • Low Flow Diversion
  • North Diversion Channel Bike Path, Paseo del North and Alameda Crossing

 

Year 10  [July, 1998 – June, 1999]

  • South Pino Arroyo – Wyoming Boulevard Crossing

 

Year 9  [July, 1997 – June, 1998]

  • Bike Path Notches

 

Year 8  [July, 1996 – June, 1997]

  • Bicycle Paths under Bridge Structure, 1:40, 1:45
  • Hidden Valley Drop Structure, 1:10
  • Orifice Wall, Calabacillas Outlet Project, 1:5
  • Safety Grates in Trapezoidal Channels, 1:20
  • Cabezon Crossing, 1:12
  • Primrose Pointe Supercritical Baffle Chute, 1:16.67
  • Hubbell Lake Diversion, 1:30

 

Year 7  [July, 1995 – June, 1996]

  • Sunset Hills Channel, Camino Arroyo
  • Ventana Ranch Confluence
  • Piedras Marcadas Spillway

 

 Year 6  [July, 1994 – June, 1995]

  • Outlet Baffle Chute, Runway 3-21, AIA
  • El Camino/North La Cueva Confluence

 

Year 5  [July, 1993 – June, 1994]

  • Bear Canyon Arroyo, Eubank Crossing, 1:20
  • Piedras Marcadas Confluence, 1:20
  • South Domingo Baca/Paseo del Norte Outfall, 1:24
  • Tennyson Crossing, South Domingo Baca, 1:60
  • South Diversion Channel Inlet at Stadium, 1:20

 

Year 4  [July, 1992 – June, 1993]

  • Bicycle Paths under Bridge Structure, 1:40, 1:45
  • Hidden Valley Drop Structure, 1:10
  • Orifice Wall, Calabacillas Outlet Project, 1:5
  • Safety Grates in Trapezoidal Channels, 1:20
  • Cabezon Crossing, 1:12
  • Primrose Pointe Supercritical Baffle Chute, 1:16.67
  • Hubbell Lake Diversion, 1:30

 

 Year 3  [July, 1991 – June, 1992]

  • Vineyard Arroyo, Sta. 0+00, 1:12
  • Vineyard Arroyo, Sta. 5+00, 1:12
  • Scour at Spur Dikes, 1:12
  • Modesto/Tennyson Pipe Exit Energy Dissipater, 1:18
  • Borrega Pipe Inlet, 1:12
  • Corrales Main Canal/Calabacillas Storm Sewer Outlet, 1:8

 

 Year 2  [July, 1990 – June, 1991]

  • North Pino Inlet at Hoffmantown Baptist Church, 1:4
  • Tramway Diversion Structure, Bear Canyon, 1:12
  • Black Transition, 1:20
  • Hahn Ribs, 1:24
  • Dennison Emergency Spillway, 1:36
  • Black Arroyo Spillway, 1:36
  • Black Arroyo Spillway Restudy, 1:12

 

 Year 1  [Jan, 1990 – June, 1990]

  • Construction and calibration