UNM

Home

Hydraulics Lab

Projects

People

Links

Contact Us

AMAFCA

 

 

Current Project - 2007

Year 18  [ 2006 – 2007 ]

Year 17  [ 2005 – 2006 ]

Year 16  [ 2004 – 2005 ]

Year 15  [ 2003 – 2004 ]

Year 14  [ 2002 – 2003 ]

Year 13  [ 2001 – 2002 ]

Year 12  [ 2000 – 2001 ]

Past Projects [ 1990 – ]

 

CURRENT PROJECT:  La Cueva Curve Water Intake Modeling

 

Full modeling report  in [pdf] (unavailable­)

Purpose

The La Cueva arroyo discharges into the North Diversion Channel south of Balloon Fiesta Park. A series of debris filters will be added to the concrete lined trapezoidal channel at the curve directly before the discharge point. The Hydraulics lab will study options for the intake structures for the 4 pipes that will divert 1,700 cfs of the 4,800 cfs 100-year storm into the debris filters.

Site of debris traps

 

North Diversion Channel

 

La Cueva Arroyo

 

Balloon Fiesta Park

 

 

Below is the preliminary model of a section of the La Cueva arroyo (curve is reversed due to space limitations)

 

 

 

  [Back] [Top of the Page]