Click the figure
for animation in YouTube
!
|
Albuquerque Diversion Dam and Irrigation Gates on
Channel - Albuquerque
diversion dam, 2-D velocity vectors for different gate operations - 2-D Hydrodynamic
model, a total of 7 days of simulation time to complete all runs |
|
River Intake Structure - Detailed
intake structure geometry - Dynamic
simulation of streamlines and velocity contours - Fish
screen impact on flow transitions - 3-D CFD
model, a total of 5 days of simulation time to complete all runs |
|
Small Dam for Irrigation and Flood Control - Sediment
transport on small size irrigation dam with velocity contour - Rubber
dam for flood control - 3-D CFD
model, a total of 5 days of simulation time to complete all runs |