Sediment Exclusion and Erosion Control

 

Click the figure for animation in YouTube !

 

Click for Animation!

Channel Bed Scour and Deposition Due to Bridge Piers

 

- Sediment transport and channel bed scour due to bridge piers

- Channel bank erosion control using vanes (dike)

- 3-D CFD model, a total of 4 days of simulation time to complete all runs

 

Channel Bed Changes Due to Albuquerque Diversion Dam Operation

 

- Sediment transport and channel bed aggregation and degradation due to the diversion gate openings

- Dynamic simulation of channel bed changes

- 2-D hydrodynamic model, a total of 10 days of simulation time to complete all runs

 

  

 

Click for Animation!

Sediment Exclusion at Intake Structure of the Albuquerque Diversion Dam

 

- Effective sediment exclusion at river intake structure using submerged vanes

- 3-D CFD model, a total of 5 days of simulation time to complete all runs

Back to Jungseok’s HOME