Click the figure
for animation in YouTube
!
|
|
Channel Bed Scour and Deposition Due to Bridge
Piers - Sediment
transport and channel bed scour due to bridge piers - Channel
bank erosion control using vanes (dike) - 3-D CFD
model, a total of 4 days of simulation time to complete all runs |
|
Channel Bed Changes Due to Albuquerque Diversion
Dam Operation - Sediment
transport and channel bed aggregation and degradation due to the diversion
gate openings - Dynamic
simulation of channel bed changes - 2-D hydrodynamic
model, a total of 10 days of simulation time to complete all runs |
|
Click for Animation!
|
Sediment Exclusion at Intake Structure of the
Albuquerque Diversion Dam -
Effective sediment exclusion at river intake structure using submerged vanes - 3-D CFD
model, a total of 5 days of simulation time to complete all runs |