Lobo Lab - Pod & Training Center - Project List


as of 7/22/03


        Here is the Lobo Lab To Do List (some projects will be 
	initiated prior to the opening of the SUB due to remodeling 
        constraints).  
	
	Please review this list, to add to it, contact either Joseph/Mark 
	with your additions so an exact record can be maintained.

        Thank You, Pod Management

================================================================================
                                    August
                          Sun Mon Tue Wed Thu Fri Sat 
                                               1   2  
                           3   4   5   6   7   8   9  
                          10  11  1   13  14  15  16  
                          17  18  19  20  21  22  23  
                          24  25  26  27  28  29  30  
                          31
================================================================================
LOBO LAB -- OPEN 8am-10:30pm, Monday through Thursday
         -- OPEN 8am-5pm, Friday
         -- OPEN 12pm-5pm, Saturdays
         -- OPEN 12pm-8pm, Sundays

POD SCHEDULING - Friday, July 25, 6pm DSH -- Robert Sebesta
(Break and Fall Hours) -- DONE

SCON Training -- Dates, Times, Location, Agenda -- Robert Sebesta -- DONE

Implementation of the following tasks will be done once SUB is OPEN.
--------------------------------------------------------------------------------
Send Lobo Lab hours to Scons prior to Pod Scheduling -- Joseph -- DONE

Update Pod Guide to include Lobo Lab hours -- Joseph, PUBS -- DONE

Update CIRT webpage to include Lobo Lab information -- Joseph, PUBS -- DONE

Interview/hire new scons -- Robert, Anna, Mark, Joseph -- DONE
(2 scons on duty at all times)

Review punch list for our area -- Mark, Tina, Joseph - DONE
(include Tina in punchlist walk-through)

Check power on all receptacles -- Robert Sebesta - DONE
(tag all non-clean power receptacles)

Check type of receptacle being used in furniture -- Mark, Tina - DONE
(how are tables wired - are they marked on the breaker)

Check out the HVAC thermostat locations (not near any hardware) -- Mark, 
Tina - DONE

Review all procedures for warranty work associated with furniture, HVAC,
fire protection, carpet, chairs, painting, ceiling, lighting, etc... who
is our contact?!? - Mark Harty

Review door key access for Front door-1012, Emergency door-1012-1, 
Training Center door-1013 ( keyed alike) -- Mark, Tina - DONE

Order security alarm system -- Mark, Tina - DONE
(prox-card access)

Issue keypad codes to LoboLab scons -- Joseph, Tina -- DONE

Order security alarm crashbar for emergency exit door -- Mark, Tina - DONE
(hook-up with current alarm system)

Order 115 network cables from Tony Waldron -- Joseph, HWM, Mark - DONE
(printers, PCs, Macs, e-mail stations)

Install network cables from faceplates to cpu locations -- Robert - DONE 
(visit wire center that supports Lobo Lab)
(how are faceplates labeled)

Order and install security cpu locks for all hardware -- Joseph, Robert  
(Printers, PCs, Macs, Zips, External Floppies)

Order test Mac prototype in early -- Mark, Barbara, Joseph - DONE

Order 34 Macs (32 client, 1 scon, 1 test) -- Mark, Barbara, Joseph - DONE
(coordinate delivery date with SUB and Apple)

Order Mac Server (PO# 728289) -- Mark, Barbara, Joseph -- DONE
(rack mounted in CIRT's Computer Room 2124)

Order test PC prototype in early -- Mark, Aaron, Joseph -- DONE
(delivery date, Tuesday, April 1)

Order 75 PCs -- (72 client, 1 scon, 1 test, 1 instructor) -- Mark, Aaron, - DONE Joseph (coordinate tentative delivery date with SUB and INS for Monday, 
June 23)

Order PC server and UPS -- Mark, Aaron, Joseph - DONE

Order and install (8) e-mail stations -- Aaron, Joseph - DONE
(include security lock for both cpu and keyboard)

Order, test, train and install LanDESK -- Mark, Aaron - On-going...

Order specific pod needs, manuals, supplies, paper, box of rags, box of 
20 gallon trash bags, vacuum cleaner and bags, 32 gallon trash can with 
wheels, box of rags -- Mark 

Order sign podium stand -- Joseph -- DONE

Order (1) high chair for scon desk -- Joseph - DONE

Order (10) chairs from Contract Associates -- Joseph - DONE 
(will call for delivery instructions prior to delivery)

Order and install How To Rack -- Joseph -- DONE 

Order 109 mouse pads -- Joseph - DONE

Order (2) storage cabinet -- Joseph - DONE

Order (3) clocks -- Joseph - DONE

Order (3) printers (order toner for printers) -- Joseph -- DONE

Order printer tables -- Mark - DONE

Order (2) color scanners (Mac & PC) -- Joseph -- DONE

Order (1) projector (ceiling mounted) -- Joseph -- 
(include laptop and DVD reader hook-up capability)
(get quotes from vendors)

Order (2) vacuum cleaner -- Robert  -- DONE

Order Lobo Lab pod signage (food/drink/cell phone/exit-entrance) -- Mark
(Kerrie Copelin will provide sign holders for Lobo Lab)

Purchase (2) handicap workstation tables -- Mark -- DONE

Order PC & Mac & training center software -- Mark, JoAnn, Barbara - DONE
(essential & instructional software)

Prior to opening totally clean Lobo Lab -- Corey Fiala & Sconcrew - DONE
Wipe down all counter-tops and Scon's desk.

Set-up Lobo Lab cleaning schedule for Fall semester -- Robert, Corey
(post schedule in sconsdoc for scons' access)

================================================================================