Case Study - UNM - Upgrade Plans (Cont.)
Phasing. When additional plates need to be activated, only 10/100Mbps Enet switches will be acquired. They will be installed in locations where bandwidth is needed the most.
Shared hubs will stay where bandwidth is needed the least untill all shared hubs are replaced within 3-4 years.