Domestic Water Distribution System Project Map --a UNM Physical Plant Department Project --Map Updated 1-14-2002 The project is now working along Redondo Drive Loop Road finishing the concrete valve boxes in several locations. Please use caution while driving.in the southwest sector of main campus. Please use caution when passing the work zone.. Work is now in progress near the Chemistry Bldg as well as Scholes Hall The project is now south of Scholes Hall.
Domestic Water System: A recent study helped to create this project that will upgrade our domestic water system. The project will take place on Redondo Loop and the West Main Campus areas, affecting traffic around campus and buildings such as Scholes Hall, Terrace Mall and Anthropology. The map below highlights the project parameters and the current location of the trenching and any traffic inconveniences. Please see the map below for areas affected by the project and some expected dates. For information on other Utility projects (chilled water lines, steam water lines, Ford Utility Plant upgrade, new Lomas Chiiler Plant, Lomas electrical substation upgrade) please visit this site. For traffic alerts on lane and road closures related to this and other projects check out alerts. UNM Contact: Project Engineers: Project Contractors:
Related Links: UNM
Physical Plant Department Sabra Jane Basler/Brian
Eagan MSC05 3330 1801 Roma Avenue
NE, Room 128 Telephone: (505)
277-7590
Copyright
© 2006 The University of New Mexico. |
|