PUBLICATIONS AND CONFERENCE PROCEEDINGS:


Bogus, Susan M., Shane, Jennifer S., and Molenaar, Keith R.(2010)  “Contract Payment Provisions and Project Performance: An Analysis of Municipal Water and Wastewater Facilities”   Accepted for publication in Public Works Management & Policy.

Migliaccio, Giovanni C., Bogus, Susan M., and Chen, Ao.  (2010) “The Effect of Design-Build Procurement Duration on Performance of Transportation Projects”   Accepted for publication in the Transportation Research Record.

Bogus, Susan M., Migliaccio, Giovanni C., and Cordova, Arturo A. (2010) “Data Quality Assessment for Manual Pavement Distress Evaluations”  Accepted for publication in the Transportation Research Record.

Bogus, Susan M., Song, Jongchul, Waggerman, Raymond, and Lenke, Lary R.  (2010) “Rank Correlation Method for Evaluating Manual Pavement Distress Data Variability.”  ASCE Journal of Infrastructure Systems. 16(1), 66-72.

Bogus, Susan M., Migliaccio, Giovanni C., and Cordova, Arturo A. (2010) “Performance of Manual Condition Surveys Using Inter-Rater Agreement Measurements” Proceedings of the CIB 2010 World Congress, The Lowry, Salford Quays, United Kingdom, May 10-13, 2010.

Migliaccio, Giovanni C., Bogus, Susan M., and Chen, Ao. (2010)  “Relationship between Design-Build Procurement Duration and Project Success” Proceedings of the CIB 2010 World Congress, The Lowry, Salford Quays, United Kingdom, May 10-13, 2010.

Bogus, Susan M., Shane,  Jennifer S., Molenaar, Keith R. (2010) “Comparison of Water/Wastewater Project Performance by Project Delivery System and Payment Provision” Proceedings of the 2010 Construction Research Congress, Banff, Alberta, Canada, May 2010.

Blacud, Nicolas A., Bogus, Susan M., Diekmann, James E., and Molenaar, Keith, R. (2009). “Sensitivity of Construction Activities under Design Uncertainty.”  ASCE Journal of Construction Engineering and Management, 135(3), 199-206.

Phillips, H. Clay*, Bogus, Susan M. and Ross, Timothy J. (2009) “An Approach to Classifying Uncertainties in Construction Schedules.” Proceedings of the 2009 Construction Research Congress, Seattle, WA, April 2009, pp. 876-885.

Bogus, Susan M. and Howe, Kerry J. (2008) “Innovative Design-Build Approach to Project-Based Learning”  Proceedings of the 2008 ASEE Gulf-Southwest Annual Conference, Albuquerque, NM, March 2008.

McCuskey, M., RedaTaha, M.M., and Bogus S. (2007) “A Robust Sustainability Metric Using Possibility Distributions” Proceedings of the 2007 ASCE International Workshop on Computing in Civil Engineering. Pittsburgh, PA, July 2007, pp. 494-501.

Blacud, Nicolas A., Bogus, Susan M., Molenaar, Keith R., and Diekmann, James E. (2007) “Beginning Construction Under Design Uncertainty” Proceedings of the 2007 ASCE Construction Research Congress. Bahamas, May 2007.

Hyderabad, Suhasini and Bogus, Susan M. (2007) “AHP-Based Selection Model for Best Sustainable Practices for Construction Projects” Proceedings of the 2007 ASCE Construction Research Congress. Bahamas, May 2007.

Gutierrez, Brian C. and Bogus, Susan M. (2007) “The Facility Ramifications of Implementing Lean in a Batch Manufacturing Plant” Proceedings of the IGLC-15: International Group for Lean Construction Conference. Lansing, MI, July 2007, pp. 391-399.

Bogus, Susan M., Molenaar, Keith R., and Diekmann, James E. (2006). “Strategies for Overlapping Dependent Design Activities.” Construction Management and Economics, 24(7-9), 829-837.

Lee, Jae-Seob, Molenaar, Keith R., Bogus, Susan M., and Diekmann, James E. (2006) “An Activity Overlapping Algorithm for Construction.” Proceedings of the Joint International Conference on Computing and Decision Making in Civil and Building Engineering. Montreal, Canada, June 2006, pp. 3827-3834.

Bogus, Susan M. and Rounds, Jerald L. (2006) “Incorporating Leadership Skill Development in Construction Training Programs.” Proceedings of the ASCE/CIB Conference on Leadership and Management in Construction. Bahamas, May 2006, pp. 135-140.

Gilchrist, Tracy and Bogus, Susan. (2006) “Sustainable Construction Materials and Procedures for U.S. National Park Service Projects.” Proceedings of the CSCE International Construction Specialty Conference. Calgary, Canada, May 2006.

Bogus, Susan M., Molenaar, Keith R., and Diekmann, James E. (2005). “A Concurrent Engineering Approach to Reducing Design Delivery Time.”  ASCE Journal of Construction Engineering and Management, 131(11), 1179-1185.

Molenaar, Keith R., Bogus, Susan M., and Priestly, Jenny M. (2004). "Design/Build for Water/Wastewater Facilities: State of the Industry Survey and Three Case Studies." ASCE Journal of Management in Engineering, 20(1), 16-24.

Bogus, Susan (2003). "A Strategy for Reducing Design Delivery Time." Proceedings of the ASCE Construction Research Council PhD Research Symposium. Nashville, TN, November 2003, pp. 725-734.

Bogus, Susan, Diekmann, James E., and Molenaar, Keith R. (2002). "A Methodology to Reconfigure the Design-Construction Interface for Fast-Track Projects." Proceedings of the ASCE & EG-ICE Joint Workshop on Information Technology in Civil Engineering. Washington, DC, November 2002, pp. 258-272.

Bogus, Susan and Diekmann, James (2001). "Digital Integration of Design Data and Construction Products: Applications in Education and Training." Proceedings of the ASCE Special Conference on Fully Integrated and Automated Project Processes in Civil Engineering. Blacksburg, VA, January 2002, pp. 456-461.

Molenaar, Keith and Bogus, Susan (2000). "Is the Price Really Right?" Water Environment & Technology, 12(7), 29-32.

Bogus, Susan, Songer, Anthony D., and Diekmann James (2000). "Design-Lead Lean." Proceedings of the International Group for Lean Construction Eighth Annual Conference (IGLC-8), Brighton, England, July 2000.

Civil Engineering Home