PUBLICATIONS AND CONFERENCE PROCEEDINGS:
Bogus, Susan M., Shane, Jennifer S., and Molenaar, Keith
R.(2010) “Contract Payment
Provisions and Project Performance: An Analysis of Municipal Water and
Wastewater Facilities” Accepted
for publication in Public Works Management & Policy.
Migliaccio, Giovanni C., Bogus, Susan M., and Chen,
Ao. (2010) “The Effect of
Design-Build Procurement Duration on Performance of Transportation
Projects” Accepted for publication
in the Transportation Research Record.
Bogus, Susan M., Migliaccio, Giovanni C., and Cordova,
Arturo A. (2010) “Data Quality Assessment for Manual Pavement Distress
Evaluations” Accepted for
publication in the Transportation Research Record.
Bogus, Susan M., Song, Jongchul, Waggerman, Raymond, and
Lenke, Lary R. (2010) “Rank
Correlation Method for Evaluating Manual Pavement Distress Data
Variability.” ASCE Journal of
Infrastructure Systems. 16(1), 66-72.
Bogus, Susan M., Migliaccio, Giovanni C., and Cordova,
Arturo A. (2010) “Performance of Manual Condition Surveys Using
Inter-Rater Agreement Measurements” Proceedings of the CIB 2010 World
Congress, The Lowry, Salford Quays, United Kingdom, May 10-13, 2010.
Migliaccio, Giovanni C., Bogus, Susan M., and Chen, Ao.
(2010) “Relationship between Design-Build
Procurement Duration and Project Success” Proceedings of the CIB 2010
World Congress, The Lowry, Salford Quays, United Kingdom, May 10-13,
2010.
Bogus, Susan M., Shane,
Jennifer S., Molenaar, Keith R. (2010) “Comparison of
Water/Wastewater Project Performance by Project Delivery System and
Payment Provision” Proceedings of the 2010 Construction Research
Congress, Banff, Alberta, Canada, May 2010.
Blacud, Nicolas A., Bogus, Susan M., Diekmann, James E.,
and Molenaar, Keith, R. (2009). “Sensitivity of Construction Activities
under Design Uncertainty.” ASCE
Journal of Construction Engineering and Management, 135(3), 199-206.
Phillips, H. Clay*, Bogus, Susan M. and Ross, Timothy J.
(2009) “An Approach to Classifying Uncertainties in Construction Schedules.”
Proceedings of the 2009 Construction Research Congress, Seattle, WA,
April 2009, pp. 876-885.
Bogus, Susan M. and Howe, Kerry J. (2008) “Innovative
Design-Build Approach to Project-Based Learning” Proceedings of the 2008 ASEE
Gulf-Southwest Annual Conference, Albuquerque, NM, March 2008.
McCuskey, M., RedaTaha, M.M., and Bogus S. (2007) “A
Robust Sustainability Metric Using Possibility Distributions” Proceedings
of the 2007 ASCE International Workshop on Computing in Civil
Engineering. Pittsburgh, PA, July 2007, pp. 494-501.
Blacud, Nicolas A., Bogus, Susan M., Molenaar, Keith R.,
and Diekmann, James E. (2007) “Beginning Construction Under Design
Uncertainty” Proceedings of the 2007 ASCE Construction Research Congress.
Bahamas, May 2007.
Hyderabad, Suhasini and Bogus, Susan M. (2007) “AHP-Based
Selection Model for Best Sustainable Practices for Construction Projects”
Proceedings of the 2007 ASCE Construction Research Congress. Bahamas, May
2007.
Gutierrez, Brian C. and Bogus, Susan M. (2007) “The Facility
Ramifications of Implementing Lean in a Batch Manufacturing Plant”
Proceedings of the IGLC-15: International Group for Lean Construction
Conference. Lansing, MI, July 2007, pp. 391-399.
Bogus, Susan M., Molenaar, Keith R., and Diekmann, James
E. (2006). “Strategies for Overlapping Dependent Design Activities.”
Construction Management and Economics, 24(7-9), 829-837.
Lee, Jae-Seob, Molenaar, Keith R., Bogus, Susan M., and
Diekmann, James E. (2006) “An Activity Overlapping Algorithm for
Construction.” Proceedings of the Joint International Conference on
Computing and Decision Making in Civil and Building Engineering.
Montreal, Canada, June 2006, pp. 3827-3834.
Bogus, Susan M. and Rounds, Jerald L. (2006)
“Incorporating Leadership Skill Development in Construction Training
Programs.” Proceedings of the ASCE/CIB Conference on Leadership and
Management in Construction. Bahamas, May 2006, pp. 135-140.
Gilchrist, Tracy and Bogus, Susan. (2006) “Sustainable
Construction Materials and Procedures for U.S. National Park Service
Projects.” Proceedings of the CSCE International Construction Specialty
Conference. Calgary, Canada, May 2006.
Bogus, Susan M., Molenaar, Keith R., and Diekmann, James
E. (2005). “A Concurrent Engineering Approach to Reducing Design Delivery
Time.” ASCE Journal of
Construction Engineering and Management, 131(11), 1179-1185.
Molenaar, Keith R., Bogus, Susan M., and Priestly, Jenny
M. (2004). "Design/Build for Water/Wastewater Facilities: State of
the Industry Survey and Three Case Studies." ASCE Journal of
Management in Engineering, 20(1), 16-24.
Bogus, Susan (2003). "A Strategy for Reducing Design
Delivery Time." Proceedings of the ASCE Construction Research
Council PhD Research Symposium. Nashville, TN, November 2003, pp.
725-734.
Bogus, Susan, Diekmann, James E., and Molenaar, Keith R.
(2002). "A Methodology to Reconfigure the Design-Construction
Interface for Fast-Track Projects." Proceedings of the ASCE &
EG-ICE Joint Workshop on Information Technology in Civil Engineering.
Washington, DC, November 2002, pp. 258-272.
Bogus, Susan and Diekmann, James (2001). "Digital
Integration of Design Data and Construction Products: Applications in
Education and Training." Proceedings of the ASCE Special Conference
on Fully Integrated and Automated Project Processes in Civil Engineering.
Blacksburg, VA, January 2002, pp. 456-461.
Molenaar, Keith and Bogus, Susan (2000). "Is the
Price Really Right?" Water Environment & Technology, 12(7),
29-32.
Bogus, Susan, Songer, Anthony D., and Diekmann James
(2000). "Design-Lead Lean." Proceedings of the International
Group for Lean Construction Eighth Annual Conference (IGLC-8), Brighton,
England, July 2000.
|