Inundation of habitat restoration features in the South Diversion Channel sub-reach of the Rio Grande, New Mexico

 

Introduction

Under NMISC Project RG-22, “Middle Rio Grande Riverine Habitat Restoration: Phase 1,” construction took place between February 24 and March 27, 2006, to create 6 habitat features in the South Diversion Channel (SDC) sub-reach of the Albuquerque Reach of the Rio Grande, New Mexico. 3 bank features below the SDC confluence with the Rio Grande were constructed by cutting and moving soil material to lower the river banks.

                         

                         

                         

Construction of Bank #1 (2)

Elevation contours of Bank #1 (3)

Cross-section of Bank #1 (3)

 

                        

                        

                        

Construction of Bank #2 (2)

Elevation contours of Bank #2 (3)

Cross-section of Bank #2 (3)

 

                        

                        

                        

Construction of Bank #3 (2)

Elevation contours of Bank #3 (3)

Cross-section of Bank #3 (3)

 

Pre-construction surveys in 2005 created elevation contours and cross-section profiles for all potential sites for restoration, including bank features.

 

Objective

Looking at gages upstream and downstream of constructed bankline features, this study sought to visualize, in ArcScene 10.1 (1), the interaction between the water surface, interpolated from gage height, riparian areas, and associated bankline habitat restoration features.

 

Data

Two sets of data were needed to create a 3-dimenional view of the landscape in the South Diversion Channel subreach. Gage spatial and temporal data were obtained using the same process as Assignment #5.

(4)     (5)

 

Data Processing

    

    

Laying the orthoimagery on the elevation raster allowed the imagery to be viewed as a 3-dimensional surface. For simplicity, the gage locations and gage height data were related for a single date, April 20, 2009. A surface representing the water surface was created using Natural Neighbor interpolation.

 

Result

 

Discussion

    

 

References

(1) Esri, 2012. ArcScene 10.1 [computer software], Redlands: Esri.
(
2) SWCA Environmental Consultants (SWCA), 2006. Summary of Construction Activities at the South Diversion Channel Subreach, Albuquerque, NM: Prepared for the New Mexico Interstate Stream Commission.
(3) SWCA & Mussetter Engineering, Inc. (MEI), 2006. Initial Island and Bar Geomorphic Surveys for the Rivering Habitat Restoration Project in the Albuquerque Reach, Middle Rio Grande, New Mexico, Albuquerque, NM: Prepared for the New Mexico Interstate Stream Commission.
(
4) U.S. Geological Survey (USGS), 2014. The National Map Viewer, DOI: Map services and data available from U.S. Geological Survey, National Geospatial Program.
(
5) U.S. Geological Survey (USGS), 2014. USGS Surface-Water Daily Data for the Nation, DOI: Surface-water and groundwater data and statistics available from U.S. Geological Survey.

 