CE-477: Advanced Planning and Estimating:
Time and cost budgeting is used for project control through management information
and systems engineering. Topics to include- Cost integrated Scheduling,
Earned Value, Probabilistic Estimating and Scheduling, Crashing, Trade-off
Analysis and Forecasting.
Prerequisite: 277 or Equivalent.
SPRING:
CE-479L/579L: Methods Improvement Lab:
This course focuses on the core of Construction Engineering and Management.
It deals with improving the efficiency with which construction operations
are performed. Management of productivity, involving Preplanning, Work
Sampling, Time Lapse Photography, methods analysis and methods improvement
related to construction. Safety, motivation and worker satisfaction as
related to productivity are included.
Prerequisite: Senior Standing.
CE-492/598: Design/Construction Integration:
This course provides students the opportunity to design and develop a comprehensive,
innovative construction management plan for a construction project, including
consideration of cost time and the production process. A detailed study
will be developed based on written proposals by student teams.
|
|